Project Profiles

Short Summaries
Expanded Summaries

Project Name

Olympic  Condominiums

Description

Condominiums

 

Project

Building Envelope Remediation

Duration and Time

11 Months, 2003

Location

Bellingham, Washington

Original Construction

Remediated Construction

Cladding

Wood Siding, EIFS, Steel Siding

Cladding

Cement Fiber Siding with Wood Trim and Stucco

Structure

Wood Frame Construction over Pre-stressed Concrete Panels over Below Grade Parking Garage

Structure

Replacement of Exterior Gypsum Sheathing, Partial Replacement of Plywood Sheathing and Major Framing Repairs, Fungicide Application to Entire Exterior

Weather Resistive Barrier (WRB)

One Ply of Building Paper

Weather Resistive Barrier (WRB)

Two Plies of 60-Minute Paper

Drainage Course

None

Drainage Course

3/8” Cedar Battens over WRB at Siding Areas

Interior

Gypsum Wall Board with Vinyl Wall Coverings and Paint

Interior

Interior Finish Restoration,

Waterproofing

Concrete over Modified Bitumen

Waterproofing

New 60 Mil Vinyl Sheet Waterproofing over Concrete and over Cement Fiber over Wood, with PVC Clad Metal

Roofing

Modified Bitumen Without Base Flashing

Roofing

New Modified Bitumen, and Reconfigured Ventilation, New Clamping Ring Drains

Architectural Sheet Metal

Copings

Architectural Sheet Metal

New Copings, Vent Hoods, Gutters at Deck Structures

   Expanded Project Summary Coming Soon

  

  

  

Back To Top

Project Name

Village on The Green Phase I

Description

Six Single Family Homes

  

Project

Building Envelope Remediation

Duration and Time

3 Month Project, Winter / Spring  2003

Location

Bellingham, Washington

Original Construction

Remediated Construction

Cladding

Barrier EIFS

Cladding

Cement Fiber Siding and Stucco

Structure

Wood Frame Construction

Structure

Repairs to Sheathing and Framing

Weather Resistive Barrier (WRB)

None

Weather Resistive Barrier (WRB)

Two Plies of 60-Minute Paper

Interior

Gypsum Wall Board with Vinyl Wall Coverings and Paint

Interior

Mold Clean-up and Interior Finish Restoration

Drainage Course

None

Drainage Course

æ” cedar battens over WRB

Waterproofing

35 mil Vinyl Sheet Waterproofing

Waterproofing

60 mil Vinyl Sheet Waterproofing with Clad Metal Flashing

Roofing

Composition Roofing

Roofing

New Kickout Flashings, Re-slope Gutters, add Rainleaders

Click On Photos to Link to Expanded Project Summary, Includes Approximately 80 Project Photos

  

   

   

Back To Top

Project Name

YouthCare

Description

Social Services Building

  

Project

Building Envelope Remediation

Duration and Time

Two Projects, 2002, and 2003

Location

North Seattle, Washington

Original Construction

Remediated Construction

Cladding

Stucco and Vinyl Siding

Cladding

Replace Stucco and Repairs to Vinyl Siding.  Install Cement Fiber Architectural Enhancements at Buildouts

Structure

Wood Frame Construction,

Structure

Repairs to Sheathing and Framing,

Weather Resistive Barrier (WRB)

One Ply of 60-Minute Paper

Weather Resistive Barrier (WRB)

Two Plies of 60-Minute Paper

Interior

Built in Furnishings, Gypsum Wall Board with Vinyl Wall Coverings and Paint

Interior

Mold Clean-up and Interior Finish Restoration

Waterproofing

Polyurethane

Waterproofing

Perimeter Repairs to Polyurethane Waterproofing

Roofing

Modified Bitumen

Roofing

Install Additional Drains, Replace Scuppers, Repair Vents and Base Flashings

Expanded Project Summary Coming Soon

  

  

     

       

      

Back To Top

Project Name

Canterbury Court Apartments

Description

Thirteen Building Apartments Complex

 

Project

Building Envelope Remediation

Duration and Time

12 Month Project, 2002

Location

Bellingham, Washington

Original Construction

Remediated Construction

Cladding

Vinyl Siding

Cladding

Vinyl Siding

Structure

Wood Frame Construction, Cantilever Walkways and Post and Beam Decks

Structure

Repairs to Sheathing and Framing, Repairs to Deck and Walkway Structures

Weather Resistive Barrier (WRB)

Housewrap

Weather Resistive Barrier (WRB)

Two Plies of 60-Minute Paper

Interior

Gypsum Wall Board with Vinyl Wall Coverings and Paint

Interior

Mold Clean-up and Interior Finish Restoration

Waterproofing

None, Concrete over Building Paper

Waterproofing

60 mil Vinyl Sheet Waterproofing with Clad Metal Flashing Over Existing Concrete

Roofing

Composition Roofing

Roofing

Roof Replacement By Others

Click On Photos to Link to Expanded Project Summary, Includes Approximately 100 Project Photos

  

  

  

Back To Top

Project Name

English Cove

Description

Condominiums

  

Project

Selective Building Envelope Remediation

Duration and Time

Emergency Repairs 2003

Location

Redmond, Washington

Original Construction

Remediated Construction

Cladding

Vinyl Siding with Wood Trim

Cladding

Vinyl Siding with Wood Trim

Structure

Wood Frame Construction

Structure

Wood Frame Construction

Weather Resistive Barrier (WRB)

One Ply of Building Paper

Weather Resistive Barrier (WRB)

Two Plies of 60-Minute Paper

Interior

Gypsum Wall Board with Paint

Interior

Minor Interior Finish Restoration

Waterproofing

Polyurethane

Waterproofing

New 60 mil Vinyl Sheet with Clad Metal at Wood Frame Decks

Architectural Sheet Metal

 

Architectural Sheet Metal

New gutters at deck structures

Roofing

Composition Roofing

Roofing

Survey and Maintenance Repairs to 43 roofs.  Replace one roof

Expanded Project Summary Coming Soon

  

Back To Top

Project Name

Evergreen Condominiums

Description

12 Unit Condominium

  

Project

Building Envelope Remediation

Duration and Time

4 Month Project, Winter 2002

Location

Edmonds, Washington

Original Construction

Remediated Construction

Cladding

LP Siding with Wood Trim

Cladding

Cement Fiber Siding with Wood Trim

Structure

Wood Frame Construction

Structure

Repairs to Sheathing and Framing

Weather Resistive Barrier (WRB)

One Ply of Building Paper

Weather Resistive Barrier (WRB)

Two Plies of 60-Minute Paper

Drainage Course

None

Drainage Course

3/8” cedar battens over WRB

Interior

Gypsum Wall Board with Vinyl Wall Coverings and Paint

Interior

Minor Interior Finish Restoration

Waterproofing

Polyurethane Waterproofing

Waterproofing

New Polyurethane Waterproofing

Roofing

Modified Bitumen and Composition Roofing

Roofing

New Modified Bitumen, Repairs to Modified Bitumen, Repairs to Composition Roofing

Architectural Sheet Metal

Deck Parapet and Roof Copings

Architectural Sheet Metal

New Deck Parapet and Roof Copings, Vent Hoods

Expanded Project Summary Coming Soon

  

  

Back To Top

Project Name

Union Vista  Condominiums

Description

Two Building  Condominiums

  

Project

Building Envelope Remediation

Duration and Time

Two Project, Winter 2001, Fall 2001

Location

Queen Anne, Seattle, Washington

Original Construction

Remediated Construction

Cladding

Cement Fiber Siding with Plywood Trim

Cladding

Cement Fiber Siding with Plywood Trim

Structure

Wood Frame Construction

Structure

Replacement of Exterior Sheathing and Repairs Framing

Weather Resistive Barrier (WRB)

One Ply of Building Paper

Weather Resistive Barrier (WRB)

Two Plies of 60-Minute Paper

Interior

Gypsum Wall Board with Vinyl Wall Coverings and Paint

Interior

Extensive Interior Finish Restoration, Including Earthquake Damage

Waterproofing

Polyurethane Waterproofing

Waterproofing

Minor Repairs to Polyurethane Waterproofing

Roofing

Modified Bitumen

Roofing

Repairs to Modified Bitumen

Architectural Sheet Metal

Copings

Architectural Sheet Metal

New Copings, Vent Hoods

Expanded Project Summary Coming Soon