Project Profiles
|
|
|
|
Short Summaries
|
|
|
|
Expanded Summaries
|
|
|
|
|
|
|
|
|
Project Name
Olympic Condominiums
|
|
Description
Condominiums
|
|
|
Project
Building Envelope Remediation
|
|
Duration and Time
11 Months, 2003
|
|
Location
Bellingham, Washington
|
|
Original Construction
|
Remediated Construction
|
|
Cladding
Wood Siding, EIFS, Steel Siding
|
Cladding
Cement Fiber Siding with Wood Trim and Stucco
|
|
Structure
Wood Frame Construction over Pre-stressed Concrete Panels over Below Grade Parking Garage
|
Structure
Replacement of Exterior Gypsum Sheathing, Partial Replacement of Plywood Sheathing and Major Framing Repairs, Fungicide Application to Entire Exterior
|
|
Weather Resistive Barrier (WRB)
One Ply of Building Paper
|
Weather Resistive Barrier (WRB)
Two Plies of 60-Minute Paper
|
|
Drainage Course
None
|
Drainage Course
3/8 Cedar Battens over WRB at Siding Areas
|
|
Interior
Gypsum Wall Board with Vinyl Wall Coverings and Paint
|
Interior
Interior Finish Restoration,
|
|
Waterproofing
Concrete over Modified Bitumen
|
Waterproofing
New 60 Mil Vinyl Sheet Waterproofing over Concrete and over Cement Fiber over Wood, with PVC Clad Metal
|
|
Roofing
Modified Bitumen Without Base Flashing
|
Roofing
New Modified Bitumen, and Reconfigured Ventilation, New Clamping Ring Drains
|
|
Architectural Sheet Metal
Copings
|
Architectural Sheet Metal
New Copings, Vent Hoods, Gutters at Deck Structures
|
Expanded Project Summary Coming Soon
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name
Village on The Green Phase I
|
|
Description
Six Single Family Homes
|

|
|
Project
Building Envelope Remediation
|
|
Duration and Time
3 Month Project, Winter / Spring 2003
|
|
Location
Bellingham, Washington
|
|
Original Construction
|
Remediated Construction
|
|
Cladding
Barrier EIFS
|
Cladding
Cement Fiber Siding and Stucco
|
|
Structure
Wood Frame Construction
|
Structure
Repairs to Sheathing and Framing
|
|
Weather Resistive Barrier (WRB)
None
|
Weather Resistive Barrier (WRB)
Two Plies of 60-Minute Paper
|
|
Interior
Gypsum Wall Board with Vinyl Wall Coverings and Paint
|
Interior
Mold Clean-up and Interior Finish Restoration
|
|
Drainage Course
None
|
Drainage Course
æ cedar battens over WRB
|
|
Waterproofing
35 mil Vinyl Sheet Waterproofing
|
Waterproofing
60 mil Vinyl Sheet Waterproofing with Clad Metal Flashing
|
|
Roofing
Composition Roofing
|
Roofing
New Kickout Flashings, Re-slope Gutters, add Rainleaders
|
Click On Photos to Link to Expanded Project Summary, Includes Approximately 80 Project Photos
|
|

|

|
|

|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name
YouthCare
|
|
Description
Social Services Building
|

|
|
Project
Building Envelope Remediation
|
|
Duration and Time
Two Projects, 2002, and 2003
|
|
Location
North Seattle, Washington
|
|
Original Construction
|
Remediated Construction
|
|
Cladding
Stucco and Vinyl Siding
|
Cladding
Replace Stucco and Repairs to Vinyl Siding. Install Cement Fiber Architectural Enhancements at Buildouts
|
|
Structure
Wood Frame Construction,
|
Structure
Repairs to Sheathing and Framing,
|
|
Weather Resistive Barrier (WRB)
One Ply of 60-Minute Paper
|
Weather Resistive Barrier (WRB)
Two Plies of 60-Minute Paper
|
|
Interior
Built in Furnishings, Gypsum Wall Board with Vinyl Wall Coverings and Paint
|
Interior
Mold Clean-up and Interior Finish Restoration
|
|
Waterproofing
Polyurethane
|
Waterproofing
Perimeter Repairs to Polyurethane Waterproofing
|
|
Roofing
Modified Bitumen
|
Roofing
Install Additional Drains, Replace Scuppers, Repair Vents and Base Flashings
|
|
Expanded Project Summary Coming Soon
|
|

|

|
|

|

|
|

|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name
Canterbury Court Apartments
|
|
Description
Thirteen Building Apartments Complex
|

|
|
Project
Building Envelope Remediation
|
|
Duration and Time
12 Month Project, 2002
|
|
Location
Bellingham, Washington
|
|
Original Construction
|
Remediated Construction
|
|
Cladding
Vinyl Siding
|
Cladding
Vinyl Siding
|
|
Structure
Wood Frame Construction, Cantilever Walkways and Post and Beam Decks
|
Structure
Repairs to Sheathing and Framing, Repairs to Deck and Walkway Structures
|
|
Weather Resistive Barrier (WRB)
Housewrap
|
Weather Resistive Barrier (WRB)
Two Plies of 60-Minute Paper
|
|
Interior
Gypsum Wall Board with Vinyl Wall Coverings and Paint
|
Interior
Mold Clean-up and Interior Finish Restoration
|
|
Waterproofing
None, Concrete over Building Paper
|
Waterproofing
60 mil Vinyl Sheet Waterproofing with Clad Metal Flashing Over Existing Concrete
|
|
Roofing
Composition Roofing
|
Roofing
Roof Replacement By Others
|
Click On Photos to Link to Expanded Project Summary, Includes Approximately 100 Project Photos
|
|

|

|
|

|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name
English Cove
|
|
Description
Condominiums
|

|
|
Project
Selective Building Envelope Remediation
|
|
Duration and Time
Emergency Repairs 2003
|
|
Location
Redmond, Washington
|
|
Original Construction
|
Remediated Construction
|
|
Cladding
Vinyl Siding with Wood Trim
|
Cladding
Vinyl Siding with Wood Trim
|
|
Structure
Wood Frame Construction
|
Structure
Wood Frame Construction
|
|
Weather Resistive Barrier (WRB)
One Ply of Building Paper
|
Weather Resistive Barrier (WRB)
Two Plies of 60-Minute Paper
|
|
Interior
Gypsum Wall Board with Paint
|
Interior
Minor Interior Finish Restoration
|
|
Waterproofing
Polyurethane
|
Waterproofing
New 60 mil Vinyl Sheet with Clad Metal at Wood Frame Decks
|
|
Architectural Sheet Metal
|
Architectural Sheet Metal
New gutters at deck structures
|
|
Roofing
Composition Roofing
|
Roofing
Survey and Maintenance Repairs to 43 roofs. Replace one roof
|
|
Expanded Project Summary Coming Soon
|
|

|

|
|

|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name
Evergreen Condominiums
|
|
Description
12 Unit Condominium
|

|
|
Project
Building Envelope Remediation
|
|
Duration and Time
4 Month Project, Winter 2002
|
|
Location
Edmonds, Washington
|
|
Original Construction
|
Remediated Construction
|
|
Cladding
LP Siding with Wood Trim
|
Cladding
Cement Fiber Siding with Wood Trim
|
|
Structure
Wood Frame Construction
|
Structure
Repairs to Sheathing and Framing
|
|
Weather Resistive Barrier (WRB)
One Ply of Building Paper
|
Weather Resistive Barrier (WRB)
Two Plies of 60-Minute Paper
|
|
Drainage Course
None
|
Drainage Course
3/8 cedar battens over WRB
|
|
Interior
Gypsum Wall Board with Vinyl Wall Coverings and Paint
|
Interior
Minor Interior Finish Restoration
|
|
Waterproofing
Polyurethane Waterproofing
|
Waterproofing
New Polyurethane Waterproofing
|
|
Roofing
Modified Bitumen and Composition Roofing
|
Roofing
New Modified Bitumen, Repairs to Modified Bitumen, Repairs to Composition Roofing
|
|
Architectural Sheet Metal
Deck Parapet and Roof Copings
|
Architectural Sheet Metal
New Deck Parapet and Roof Copings, Vent Hoods
|
|
Expanded Project Summary Coming Soon
|
|

|

|
|

|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Name
Union Vista Condominiums
|
|
Description
Two Building Condominiums
|

|
|
Project
Building Envelope Remediation
|
|
Duration and Time
Two Project, Winter 2001, Fall 2001
|
|
Location
Queen Anne, Seattle, Washington
|
|
Original Construction
|
Remediated Construction
|
|
Cladding
Cement Fiber Siding with Plywood Trim
|
Cladding
Cement Fiber Siding with Plywood Trim
|
|
Structure
Wood Frame Construction
|
Structure
Replacement of Exterior Sheathing and Repairs Framing
|
|
Weather Resistive Barrier (WRB)
One Ply of Building Paper
|
Weather Resistive Barrier (WRB)
Two Plies of 60-Minute Paper
|
|
Interior
Gypsum Wall Board with Vinyl Wall Coverings and Paint
|
Interior
Extensive Interior Finish Restoration, Including Earthquake Damage
|
|
Waterproofing
Polyurethane Waterproofing
|
Waterproofing
Minor Repairs to Polyurethane Waterproofing
|
|
Roofing
Modified Bitumen
|
Roofing
Repairs to Modified Bitumen
|
|
Architectural Sheet Metal
Copings
|
Architectural Sheet Metal
New Copings, Vent Hoods
|
|
Expanded Project Summary Coming Soon
|
|

|

|
| |