Western Exterior Services, Inc.

Project

Seattle Christian Schools

Title

Damage

Primary Subject

Extensive Damage

Secondary Subject

Engineered Repairs

Secondary Subject

Framing Repairs

Secondary Subject

Water Damage

Secondary Subject

Carriage Bolted Stud Repair

 

Extensive water damage occurred at the exposed ends of the buildings
 

 

 

Replacement of framing and interior finishes was required

 

The framing repair requirements were provided by a Structural Engineer SE.

New plywood sheathing was applied over the repaired framing

 

Next Seattle Christian Schools Series

Close Window

Back To Top