Western Exterior Services, Inc.

Project

Seattle Christian Schools

Title

Damage at Athletics Office

Primary Subject

Framing Damage B&A

Secondary Subject

Framing Repair

Secondary Subject

Extensive Damage

Secondary Subject

Rotted Wood

Secondary Subject

Water Control

 

Significant damage occurred at the wall of the east office
 

 

 

Some of the damage was associated with the windows, which were replaced at the wood frame construction

 

Electrical conduits, communications wiring, alarm wiring and plumbing were all affected at various locations throughout the repair

Damage was also associated with water coming of the roof and the wide copings

Substantial reframing was required

The water extended high into the wall

Three years later, there is no indication that there ever was a problem