Western Exterior Services, Inc.
|
Project |
Seattle Christian Schools |
|
Title |
Damage at Athletics Office |
|
Primary Subject |
Framing Damage B&A |
|
Secondary Subject |
Framing Repair |
|
Secondary Subject |
Extensive Damage |
|
Secondary Subject |
Rotted Wood |
|
Secondary Subject |
Water Control |
![]() |
Significant damage occurred at the wall of the east office
|
| Some of the damage was associated with the windows, which were replaced at the wood frame construction |
|
![]() |
Electrical conduits, communications wiring, alarm wiring and plumbing were all affected at various locations throughout the repair
|
| Damage was also associated with water coming of the roof and the wide copings |
![]() |
![]() |
Substantial reframing was required
|
| The water extended high into the wall |
![]() |
![]() |
Three years later, there is no indication that there ever was a problem
|