Western Exterior Services, Inc.
|
Project |
Sunset Pond Apartments |
|
Title |
Walkway repairs Before and After |
|
Primary Subject |
Walkway repairs Before and After |
|
Secondary Subject |
Duradek |
|
Secondary Subject |
Preparation for Waterproofing |
|
Secondary Subject |
PVC Clad Metal Flashing |
|
Secondary Subject |
Vinyl Sheet Waterproofing |
![]() |
Water entered at multiple transitions. Removal and replacement of the existing concrete would have greatly impacted the tenants
|
| Epoxy filler is applied to existing concrete to fill voids and promote drainage over the drainage edge metal. |
|
![]() |
The key to an attractive installation is preparation. The transition to the edge metal is filled with epoxy filler to promote free drainage over the edge.
|
| The resulting installation looks and drains well. The membrane turns up the wall behind the building paper and is welded to PVC clad edge metal at the outside edge. |
|
Next Sunset Pond Apartments Series