Western Exterior Services, Inc.

Project

Village on the Green Phase I

Title

Service Panel

Primary Subject

Damage

Secondary Subject

Water Damage at Electrical Service Panel

Secondary Subject

Framing Damage

Secondary Subject

Damage at Missing Kick-Out

Secondary Subject

One Day Power Shut-Down

 

Damage was found behind the electric service panel

 

 

The water entered at the eave to wall transition

 

The damage appeared minor at the top of the service panel

Below the panel the framing was severely decayed. The power had to be shut down to reconstruct the framing

 

Next Village on The Green I Series

Close Window

Back To Top